List Report Sorted by Tracked Item Cost

Printed: September 05, 2005, 8:39 AM
Filters: No Filter Applied

Company: XYZ Company

Notes:
Tasks that need to be completed

File created: 7:22 AM 9/5/2005
File last updated: 8:22 AM 9/5/2005
File last updated by: Tracker User
Number of tracked items: 10
Number of open tracked items: 9
Number of closed tracked items: 1
Number of items that are not assigned: 0
Total cost for all items: 33,567
Next tracked item due date: 8/30/2005
Number of open requests: 4
Number of unreviewed responses: 2
Number of past due requests: 0
First request date: 9/5/2005
Most recent request date: 9/5/2005
First response date: 9/5/2005
Most recent response date: 9/5/2005
Items without a due date: 0
Items due within 15 days: 2
Number of items that are past due: 2
Items past due by 1 - 30 days: 2
Items past due by 31 - 60 days: 0
Items past due by more than 60 days: 0
 
Tracker 1.0 by Primatech Inc. Create a custom footer for each report type
 
 
 

List Report Sorted by Tracked Item Cost

Page: 1
Tracked item reference number Tracked item text Assigned to Tracked item cost Tracked item due date Tracked item category Tracked item status Tracked item resolution
1.1.1 Consider means of cleaning the chlorine piping system which do not involve the use of water or incompatible materials Dan Smith 0 8/30/2005 Maintenance; Administrative/Training Closed I disapproved this item. Please close this item out and use this comment as a resolution.
3.1.1 Consider conducting a failure modes and effects analysis (FMEA) of a typical pressure relief valve. Paul Pataskala 341 9/14/2005 Safety On-Hold  
4.1.1 Consider installing an automatic chlorine source shutdown if the vaporizer pressure drops below 1.5 atm. David Cooper 728 10/8/2005 Engineering/Design Open  
5.1.1 Consider implementing a periodic check of vaporizer to ensure there are no pressure leaks Linda Sommerville 1,231 10/7/2005 Maintenance Pending  
1.1.1 Consider changing the SOP to require a certificate of analysis be received with each rail car and be checked before accepting the rail car. Dan Smith; David Cooper 3,232 9/22/2005 Procedures/Software Pending  
9.1.1 Consider alternatives to the present hanger arrangements to allow total insulating of the piping while minimizing external corrosion of the piping. David Cooper 4,234 9/30/2005 Engineering/Design On-Hold  
3.1.1 Consider updating SOP to include a valve configuration flow sheet Lana Sokol 5,411 10/26/2005 Procedures/Software On-Hold  
9.1.2 Consider whether alternative materials of construction are practical which will provide better internal and external corrosion resistance Lana Sokol; Linda Sommerville 5,423 9/6/2005 Engineering/Design Delayed  
2.1.1 Consider modifying the training program for maintenance personnel who may work on the chlorine system to include coverage of incompatible materials Dan Smith 5,432 10/8/2005 Administrative/Training Delayed  
12.1.1 Review the best available means for periodic testing and/or examination of the chlorine liquid piping system to ensure the system integrity Lana Sokol; Paul Pataskala 7,535 9/2/2005 Maintenance Open  

Total for Tracked item cost: 33,567

 